Skip to content
Physical AIby Santi
← All cases
CS-01B· Manufacturer / operatorQuadruped

Aker BP: autonomous inspection in Ex zones on the Valhall platform

Trial of a quadruped certified for explosive atmospheres on a producing platform, with missions supervised from shore, as a step toward unmanned platforms.

Last reviewed: 2026-11 · Methodology & sources →

Fact sheet

Organization
Aker BP, with Cognite and ANYbotics
Sector
Energy
Location
Valhall field, North Sea (Norway)
Environment
Offshore / energy
Stage
Trial
First public deployment
2023
Autonomy (editorial classification)
L3 · Conditional autonomy
Coordination (editorial classification)
Coordinated
Published payback
Not published

Deployed: ANYmal X, the Ex-certified variant of the ANYmal family. The dataset lists ANYmal D.

01The challenge

02The solution

Hardware
ANYmal X quadruped certified for Ex zones.[ANYbotics, 2023][Robotics & Automation News, 2023]
Perception
Not published
Navigation
Missions planned in ANYbotics Workforce software across 70 inspection points on two decks.[ANYbotics, 2023]
Coordination
Data analyzed in Cognite Data Fusion; the onshore control room could take over a mission for manual investigation in first-responder scenarios.[ANYbotics, 2023][Unmanned Systems Technology, 2023]

03Published KPIs

Figures as communicated, with their context and source. “Not published” means no public figure exists — a gap to close in a pilot.

KPIValueSource
Inspection pointson two decks70[ANYbotics, 2023]
Unmanned operation targetstated goal, not a result2027–2029[Unmanned Systems Technology, 2023]
Manual inspection hours avoidedNot published—
False-alarm rateevaluated, no public figureNot published—

04Lessons

Integration & operations

  • The evaluation covered reliability, response to false alarms, ad hoc monitoring, 4G connectivity and operator access to data: the criteria worth demanding in a pilot.[Unmanned Systems Technology, 2023]

Maintenance & limits

Not published

Scaling

  • Editorial analysis: the value lies less in the robot than in closing the loop (mission → data → decision) inside the operator's asset-management system.Editorial analysis